St George’s Tce, Perth

This project was carried out in 2012 in St Matrtins Arcade with:

  • ¬†After hours and weekend work carried out so as not to disturb existing tennants,
  • Walls were Rondo 64mm studs lined with Boral 13mm Plasterboards and Autex 50mm partition insulation,
  • 96mm MDF stopend to window and door openings,
  • White MDF shadowline,
  • Alspec clear anodized partition suite door frames and window frames and
  • Corninthion foam filled full height doors.