St George’s Tce, Perth
This project was carried out in 2012 in St Matrtins Arcade with:
- After hours and weekend work carried out so as not to disturb existing tennants,
- Walls were Rondo 64mm studs lined with Boral 13mm Plasterboards and Autex 50mm partition insulation,
- 96mm MDF stopend to window and door openings,
- White MDF shadowline,
- Alspec clear anodized partition suite door frames and window frames and
- Corninthion foam filled full height doors.