 This project was conducted by TDC project in 2009. Complex Ceilings were the principal ceiling contractor with approximately 16 staff and supervisor on site. Works carried out were:

  • Suspended 600 x 1200 USG 24mm Dx white tbar ceilings with Radar me2410 Se tiles and R3.5 polyester insulation over,
  • Suspended bulkheads throughout using rondo products and lined with 1omm Boral Plasterboard,
  • Suspended flush plaster board ceiling on rondo suspension system lined with 10mm Plasterboard and 75mm cove cornice and
  • Outside works were James Hardie 9mm compressed sheeting system, suspended 6mm versaliux soffits with 10mm express joints.

 